Stacks Image 3

Mergel Dredging for Cable 261 Arkona Becken

  • Mergel dredging to prepare the seabed for cable laying Section 8-12

Backfilling for Cable 261 Arkona Becken

  • Backfilling cable trench in shallow water area

Cover Crossing Point NSP 1 and 2 with Cable 261 Arkona Becken

  • Cable 261 covered with concrete mattresses on Crossing points NSP1 and NSP2